Manpower planning tells you how many people you need per role and per month, and how many to hire to close the gap. For shift and high-volume roles the formula is: required work hours divided by one person's effective hours, adjusted for rest days and shrinkage, minus the people you have, plus the people you expect to lose. You then work that number backwards into how many applicants you need.
Most manpower planning guides stop at a list of methods (ratios, trends, Delphi) without one complete calculation. This guide runs one example from start to finish, adds a store and a call center example, covers the working-hour rules in Indonesia and Malaysia that change the numbers, and ends with a spreadsheet template.
The five numbers a manpower plan produces
| Number | Question | Data source |
|---|---|---|
| Demand | How many people should be on the payroll? | Work volume, opening hours, productivity |
| Supply | How many do you have now, and how many will still be there at the end of the period? | HR records, contract end dates, turnover |
| Gap | How many short or over? | Demand minus supply |
| Hiring target | How many must start, including a buffer for early leavers? | Gap and early attrition |
| Applicants needed | How many applicants must come in to reach the target? | Conversion rate at each hiring stage |
If your plan does not give these five numbers per role and per site, your recruiting team cannot act on it yet.
Step 1: Turn workload into people
For work you can count (pick lines in a warehouse, parcels sorted, units assembled), use the workload formula.
Work hours needed = daily volume / output per hour
People present per day = work hours needed / effective hours per person per day
Example: an e-commerce warehouse processes 12,000 pick lines a day, and a picker averages 100 lines an hour.
| Step | Calculation | Result |
|---|---|---|
| Work hours needed | 12,000 / 100 | 120 hours |
| Hours per shift | 6-day week pattern in Indonesia | 7 hours |
| Utilization | Less briefings, walking between racks, waiting for stock | 85% |
| Effective hours per person | 7 x 0.85 | 5.95 hours |
| Pickers present per day | 120 / 5.95 | 20.17 people |
The output rate and utilization above are examples. Take yours from your warehouse system or from timing a few shifts, and use an ordinary day, not your best one.
The 7-hour shift comes from Indonesian working-time rules. Article 21(2) of PP No. 35 of 2021 sets 7 hours a day and 40 hours a week for a 6-day week, or 8 hours a day and 40 hours a week for a 5-day week. Rest breaks are not working time, so do not count them as productive hours. In Malaysia, section 60A of the Employment Act 1955 sets a 45-hour normal working week from 1 January 2023, so a 6-day pattern there is 7.5 hours a day.
Step 2: Add rest days and shrinkage
The 20.17 figure is the number who must be present every day. The payroll number has to be higher, for two reasons.
First, weekly rest days. The warehouse runs 7 days, but each picker works 6 and is entitled to one day of weekly rest (Article 79 of Indonesia's Law No. 13 of 2003, as amended by Law No. 6 of 2023). Multiply by 7/6.
Second, shrinkage: paid days not spent on the core job. The same Article 79 gives at least 12 working days of annual leave after 12 months of continuous service. In Malaysia, section 60E of the Employment Act gives 8 to 16 days depending on length of service. Add sickness, permitted absences and training from your attendance data.
| Shrinkage component | Days per person per year (example) |
|---|---|
| Annual leave | 12 |
| Sickness and permitted absence | 6 |
| Training and coaching | 4 |
| Total | 22 of roughly 290 working days, about 8% |
Payroll headcount = people present per day x (operating days / days worked per person) / (1 - shrinkage)
| Step | Calculation | Result |
|---|---|---|
| Rest day factor | 20.17 x 7/6 | 23.53 |
| Shrinkage factor | 23.53 / 0.92 | 25.58 |
| Round up | 26 pickers |
Round up once, at the end. Rounding at every step adds up and can leave you with one or two more people than you need.
Coverage roles: cashiers, security, front desk
A cashier has to be at the counter even when the store is quiet, so you count post hours that must be filled, not transactions.
Example: a store open 08:00 to 22:00 (14 hours) with 3 counters, plus 2 extra counters during the 17:00 to 21:00 peak.
| Step | Calculation | Result |
|---|---|---|
| Post hours per day | (3 x 14) + (2 x 4) | 50 hours |
| Cashiers present per day | 50 / 7 | 7.14 |
| Rest day factor | 7.14 x 7/6 | 8.33 |
| 8% shrinkage | 8.33 / 0.92 | 9.06 |
| Rounded | 10 cashiers |
9.06 rounds up to 10, because with 9 there will be days when a counter is empty while someone is on leave. If the budget only covers 9, decide in advance which counter closes rather than letting it happen at random.
The same method works for a 24-hour security post: 24 post hours a day, divided by 8-hour shifts on a 5-day pattern, gives 3 guards present per day, then multiply by 7/5 and divide by the shrinkage factor.
Call centers: plan by interval
Call volume is uneven through the day, so plan agents hour by hour.
| Step | Calculation | Result |
|---|---|---|
| Calls in the busiest hour | Historical data | 300 |
| Average handle time (AHT) | Talk, hold and after-call work | 300 seconds |
| Workload | 300 x 300 / 3,600 | 25 busy agents |
| Target occupancy | Agents cannot talk 100% of the time | 85% |
| Agents logged in | 25 / 0.85 | 29.4 |
| Call center shrinkage (breaks, coaching, training, absence) | Example | 30% |
| Agents scheduled for that hour | 29.4 / 0.70 | 42 |
This is a rough estimate. Workforce management teams usually use Erlang C, which accounts for a service level target (for example, 80% of calls answered within 20 seconds), and for small teams Erlang C often gives a higher number than this simple method. Use the table for a first headcount budget and check it against your WFM tool. The screening flow to fill these seats is in our guide on how to hire call center agents.
Step 3: Work out supply and the gap
Back to the warehouse. The target is 26 pickers for the next two months. Today:
| Component | Number |
|---|---|
| Active pickers today | 18 |
| Fixed-term contracts ending in the period and not renewed | 3 |
| Expected resignations: 18 x 4% a month x 2 months | 1.44, rounded to 2 |
| Supply at the end of the period | 18 - 3 - 2 = 13 |
Gap = demand - supply at the end of the period
The gap is 26 - 13 = 13 people. The 4% monthly turnover is an example. To calculate your own, and to separate resignations from ended contracts, see the employee turnover rate formula.
A common mistake is to treat today's headcount as supply. Subtract contracts that will end and resignations you can expect first, or the plan will always come up a few people short.
Step 4: Add a buffer for early leavers
Some new hires leave in their first weeks. Hire exactly 13 and you end up with fewer than 13.
Starters needed = gap / (1 - 30-day early attrition)
With 15% early attrition at day 30 (an example figure): 13 / 0.85 = 15.3, rounded up to 16 starters.
A large buffer is expensive, because each early leaver carries recruiting and training cost. See the effect in cost per hire in high-volume hiring. Better screening is the cheapest way to shrink that buffer.
Step 5: Work backwards to applicants
From 16 starters, work backwards through the conversion rate at each stage. The rates below are examples. Replace them with your own.
| Stage | Pass rate to the next stage | Calculation | Number needed |
|---|---|---|---|
| Starters | 16 | ||
| Offers accepted | 90% show up on day one | 16 / 0.90 | 18 |
| Offers made | 80% accept | 18 / 0.80 | 23 |
| Manager interviews | 60% pass | 23 / 0.60 | 39 |
| First-round interviews | 50% pass | 39 / 0.50 | 78 |
| Interview invitations | 65% attend | 78 / 0.65 | 120 |
| Applicants | 40% pass CV screening | 120 / 0.40 | 300 |
So 13 empty seats need about 300 relevant applicants. That number decides which channels you use and how long the vacancy stays open. Channels and their cost are compared in how to find employees.
The table also shows where the funnel leaks most. If only 65% of invited candidates attend, better invitations and reminders can cut the applicant target more than extra job ads can.
Step 6: Put it on the calendar
Start from the date new hires must be productive and subtract:
- Training time until they can work alone (for example, 1 to 2 weeks for a picker).
- Notice and paperwork time after the offer is accepted.
- Selection time from application to offer. Reasonable time limits per stage are in the recruitment SOP template.
- Time from posting the vacancy until enough applicants arrive.
For seasonal peaks, start earlier. A backwards schedule for the Ramadan and Eid peak is in Ramadan seasonal hiring in Indonesia and Malaysia.
Manpower planning spreadsheet template
Use one row per role, site and month. These columns are enough:
| Column | Content | Formula or source |
|---|---|---|
| Role, site, month | For example picker, Cikarang warehouse, March | |
| Daily volume or daily post hours | 12,000 lines or 50 post hours | Operations forecast |
| Output per hour | 100 lines | Warehouse system or time study |
| Hours per shift | 7, 7.5 or 8 | Working week pattern |
| Utilization | 85% | Observation (100% for coverage roles) |
| Operating days / days worked per person | 7/6 | Operating schedule |
| Shrinkage | 8% | Leave, attendance and training records |
| Demand | 26 | Steps 1 and 2, rounded up |
| Active headcount | 18 | HR system |
| Contracts ending in period | 3 | Contract end dates |
| Expected resignations | 2 | Headcount x monthly turnover x months |
| Gap | 13 | Demand - (active - ending contracts - resignations) |
| 30-day early attrition | 15% | Previous batches |
| Starters needed | 16 | Gap / (1 - early attrition) |
| Applicants needed | 300 | Backwards funnel |
| Start date | Backwards schedule |
Update active headcount and resignations monthly. Update early attrition and conversion rates each time a batch reaches day 30.
When overtime can cover a gap
Covering a gap with overtime is fast, but it has limits. In Indonesia, Article 26 of PP No. 35 of 2021 caps overtime at 4 hours a day and 18 hours a week, overtime requires the worker's agreement (Article 28), and overtime pay is mandatory. In Peninsular Malaysia, the Employment (Limitation of Overtime Work) Regulations 1980 cap overtime at 104 hours a month.
Example: the warehouse hires 22 of the 26 pickers. The gap is 4 people x 7 hours x 6 days = 168 hours a week. Spread over 22 pickers, that is 7.6 hours of overtime each per week. That is within the Indonesian weekly cap, but it costs more than normal hours, and tired staff tend to resign, which makes next month's gap bigger. Overtime suits a peak of a few days. A gap that lasts for months needs hiring.
Common mistakes
- Planning every month from the busiest day of the year, which leaves you overstaffed in normal months. Plan month by month.
- Forgetting the rest day factor, so a 7-day operation is staffed as if everyone works 7 days.
- Using senior staff output to plan for new hires, who are almost always slower in their first month.
- Not subtracting contracts that will end from supply.
- Setting a hiring target with no early attrition buffer, then finding the seats empty again a month later.
- Handing recruiters a headcount number without an applicant target and dates, so they do not know when to start or how big to go.
Where Inhire fits
Inhire (getinhire.com) is an AI screening and AI interview platform for high-volume hiring. It ranks CVs against your job criteria, runs the first-round interview by voice and produces a scorecard with a transcript for each candidate. In the backwards funnel above, Inhire handles the two rows that take the most recruiter hours, CV screening and the first-round interview, so 300 applicants do not have to be read and called one by one. Inhire does not build your manpower plan and does not decide who gets hired. Your recruiting team keeps that decision.
See how an AI interview works for first-round interviews, and read bulk resume screening if 300 applicants per role starts to feel heavy. You can start free and screen applicant CVs at no cost, no credit card needed.
